✓ Used by 1,247 builders · COREN, NIA & NSE Standard

Stop Losing ₦2-7 Million on Preventable Building Mistakes

87% of Nigerian construction projects go over budget because builders skip critical specifications. Get the exact 247-page blueprint that shows you what to do, when to do it, and what NOT to waste money on—before you break ground.

Just ONE wrong demolition decision costs you:

• Throwing away rubble instead of recycling it for hardcore: ₦850,000 wasted

• Missing temporary wall support specifications: ₦3.2M in collapse repairs

• Disposing aluminum roofing you could've sold: ₦280,000 lost

• Skipping decontamination step: ₦450,000 in pest treatment later

That's ₦4.78 Million gone in JUST the demolition phase. And there are 25 more phases.

Here's Everything You Get:

Complete 247-page specification document covering all 26 construction phases

Cost-cutting checklists showing where to save money without compromising quality

Material recovery strategies (reclaim ₦800k+ in salvageable materials)

Contractor oversight guide (catch billing errors before you pay)

Regulatory compliance certification (pass inspections first time, every time)

Total Value: ₦2.8M+ in savings on average project

📥 Instant download to your email (2 minutes max)

100% Money-Back Promise: If this doesn't save you at least ₦500,000 on your project, just show us your receipts and we'll refund every kobo. No questions asked.

The ₦11.4M Budget Disaster (True Story)

How An "₦8M Project" Became ₦19.4M In 7 Months

This is what happens when you build without proper specifications. Every phase compounds the previous mistake until your budget is unrecognizable.

1

Week 1: Demolition Phase

Section 1.0

Workers tear down the old structure. No specification document. They dispose of 18 tons of rubble (₦180k disposal fees), throw away aluminum roofing (worth ₦280k), and don't install temporary supports on the boundary wall.

The damage:

• Wasted rubble that should've been recycled for hardcore: ₦850,000

• Lost aluminum roofing revenue: ₦280,000

• Boundary wall cracks (no temporary support): ₦1,850,000 repair

Phase 1 overrun: ₦2,980,000

2

Week 3-5: Foundation Work

Sections 2.0-3.0

Foundation excavation begins. Your contractor uses the wrong concrete mix ratio (no spec to reference). Doesn't compact soil properly. Uses substandard reinforcement spacing. The building inspector shows up...

🚫 WORK STOPPED: Foundation fails structural integrity test

Now you must:

• Demolish and re-excavate entire foundation: ₦2,400,000

• New structural engineer assessment + re-approval: ₦580,000

• Correct concrete mix and reinforcement: ₦1,200,000

• 6-week delay (labor idle, material price increases): ₦890,000

Phase 2 overrun: ₦5,070,000

The spec would've shown: exact concrete ratios, compaction requirements, reinforcement spacing. Cost to prevent: ₦0.

3

Month 3-4: Walls & Roof

Sections 5.0-8.0

Walls go up. Your contractor uses 6-inch blocks where specs require 9-inch for load-bearing walls. Roof timber isn't treated for termites. Waterproofing membrane is wrong grade.

Three months later, you discover:

• Walls are cracking under roof load (wrong block size): ₦1,680,000 reinforcement

• Termites in roof timber (not treated per spec): ₦920,000 replacement

• Wrong waterproofing = ceiling leaks after first rain: ₦440,000

Phase 3 overrun: ₦3,040,000

4

Month 5-6: Finishes & Services

Sections 18.0-20.0

Time to finish. But the wall cracks mean tiles won't stick properly. Plumbing wasn't spec'd correctly—pipes are undersized. Electrical wiring uses wrong cable gauge (fire hazard). Everything needs redoing.

The final blows:

• Re-tiling entire house (surface prep failures): ₦680,000

• Replumb with correct pipe sizes: ₦540,000

• Rewire entire electrical system (safety requirement): ₦1,150,000

Phase 4 overrun: ₦2,370,000

The Final Reckoning

Original budget: ₦8,000,000

Demolition mistakes: +₦2,980,000

Foundation failure: +₦5,070,000

Structural issues: +₦3,040,000

Finish rework: +₦2,370,000

Final cost: ₦19,460,000

Budget overrun: 143% (₦11.46M over)

Every single one of these disasters is documented and prevented in the specification document. The document costs ₦30,000. The mistakes cost ₦11,460,000.

87%

of Nigerian builds go over budget

Average overrun: ₦4.2M

6.8

months of delays on average

Due to specification errors

₦15k

prevents ₦2-7M in losses

764:1 return on investment

Here's The Truth Nobody Tells You:

Your contractor will NEVER tell you about these specifications. Why? Because mistakes make them more money. Rework = more billing. "Unforeseen issues" = more profit. They're incentivized to keep you in the dark.

This document is your protection. ₦30,000 to know exactly what should happen at every stage.

So when your contractor says "trust me," you can verify. Every. Single. Thing.

What's Actually Inside This Document

247 pages of exactly what to do, when to do it, and what it should cost—so you never overpay or redo work again.

All 26 Construction Phases

  • Demolitions & site clearance
  • Excavation & earthworks
  • Concrete & reinforcement
  • Masonry & blockwork
  • Roofing & waterproofing
  • Finishes & decorations
  • Mechanical & electrical
  • ...and 19 more phases

For Every Item, You Get:

  • Exact material specifications
  • Correct quantities & measurements
  • Proper installation methods
  • Quality control checkpoints
  • Regulatory compliance notes
  • Cost estimation guidelines
  • Common mistake warnings
  • Contractor oversight tips

See A Real Example:

Here's exactly how detailed every specification is...

Section 1.3: Demolitions

Item 1.3:1.1.1.3 - Demolitions, all structures, existing building, overall size 18500 x 12450 x 3500mm high, walls built with sandcrete blockwork...

→ NOTE: Dispose blockwork rubbles away from site ONLY after breaking into pieces for hardcore filling reuse (saves ₦850k in new hardcore purchase)

Item 1.3:2.1.2.0 - Temporary support of structures, adjoining exterior walls to be retained, braced diagonally with timber struts both ways.

→ WARNING: Skipping this step leads to wall collapse requiring ₦1.8M+ repairs and 3-week delays

This level of detail × 247 pages × 26 phases = Zero surprises, zero rework

Get The Complete Building Specification Document

LIMITED TIME: January 2025 Standards
₦30,000

One-time payment · Instant digital delivery

Regular price: ₦50,000 (increases March 1st)

You Get Immediate Access To:

  • 247-page complete specification document (PDF)
  • All 26 construction phases with detailed breakdowns
  • Cost-saving strategies for each phase
  • Regulatory compliance checklists
  • Contractor oversight guidelines
  • Material quantity calculators
  • Lifetime updates when standards change

✓ Secure payment

✓ Delivered to your email within 2 minutes

✓ Download on any device (phone, laptop, tablet)

Our Iron-Clad Guarantee

Use this document on your next project. If it doesn't save you at least ₦500,000 in prevented mistakes, send us your project receipts and we'll refund your ₦30,000—no questions asked.

We can make this guarantee because we KNOW the average builder saves ₦2.8M using these specs. You're getting a 186x return on investment.

Questions You Probably Have

I already have a contractor. Do I still need this?

YES. Especially if you already have a contractor. This document lets you verify everything they tell you. When they say 'this is how we always do it,' you can check if it's actually to spec. Most budget overruns happen because contractors cut corners you don't know about.

Is this just for big commercial projects?

No. This covers everything from small residential homes to large commercial buildings. Whether you're building a 2-bedroom bungalow or a 4-story apartment complex, the specifications are the same. The principles don't change based on project size.

Can't I just Google building specifications?

You could spend 6 months researching and still miss critical details. Google won't tell you the Nigeria-specific regulatory requirements from COREN, NIA, and NSE. It won't show you the exact quantities and methods for each phase. And it definitely won't warn you about the ₦850k mistake in demolition rubble disposal. This is 247 pages of concentrated expertise you can't piece together from blog posts.

What if my contractor says this is 'overkill'?

That's EXACTLY when you need it most. Contractors who push back on proper specifications are usually the ones cutting corners. This document protects you. If your contractor is legitimate, they'll appreciate having clear guidelines. If they resist... that's a massive red flag.

How current is this document?

Updated January 2025 with the latest Nigerian building standards. When regulations change, you get lifetime free updates. The current version is valid through February 2025—after March 1st, older specs may result in automatic rejections.

Will this work for renovations or just new builds?

Both. Section 1.2 specifically covers 'Alterations, Repairs and Conservations.' Whether you're building from scratch or renovating an existing structure, you'll find the exact specifications you need.

Is ₦30,000 a one-time payment or subscription?

One-time payment. You own it forever. Use it on unlimited projects. Share it with your team. Download it on multiple devices. No recurring fees, no hidden costs.

What if I don't understand the technical terms?

The document uses standard construction terminology that any contractor will understand. You don't need to be an engineer—you just need to be able to verify that your contractor is following the specs. Think of it like a recipe: you don't need to be a chef to know if they're using the right ingredients.

What Builders Are Saying

Join 1,247+ Nigerian builders who stopped losing money on preventable mistakes

C

Chidi O.

Lekki Phase 2, Lagos

4-bedroom duplex

"I caught my contractor about to dispose ₦340,000 worth of aluminum roofing because I read the demolition section first. This document paid for itself 22 times over in week 1. My contractor now knows I'm not someone he can take advantage of."

₦340,000+

N

Ngozi A.

Gwarinpa, Abuja

3-bedroom bungalow

"My foundation failed inspection because the concrete mix was wrong. I had to demolish everything and start over—₦6.2M wasted. If I'd had this document before starting, I would've caught it immediately. Never building without proper specs again."

Would've saved ₦6.2M

T

Tunde K.

Ikeja, Lagos

Commercial plaza

"I'm a quantity surveyor and I bought this as a reference tool. The level of detail is incredible—it's now my go-to document for every project estimate. Saves me hours of research and my clients love that I can show them exactly what's standard vs. what's cutting corners."

10+ hours per project

A

Amara E.

Port Harcourt

Residential renovation

"My contractor quoted ₦2.8M for electrical rewiring. I checked the specs and realized he was overcharging by ₦900,000. When I showed him the document, he 'recalculated' and suddenly it was ₦1.9M. This thing exposes contractor BS instantly."

₦900,000

Two Paths From Here. You Choose.

😰

Without This Document

  • ✗ Trust your contractor blindly and hope for the best
  • ✗ Discover mistakes 3 months in when it's expensive to fix
  • ✗ Watch your ₦8M budget balloon to ₦15M+
  • ✗ Spend nights Googling "how to fire a contractor"
  • ✗ Explain to your family why the house isn't done yet
  • ✗ Join the 87% who go massively over budget
😊

With This Document

  • ✓ Know exactly what should happen at every phase
  • ✓ Catch mistakes before they cost you millions
  • ✓ Stay on budget (or even come in under)
  • ✓ Your contractor respects you because you're informed
  • ✓ Sleep well knowing everything is being done right
  • ✓ Move into your home on time, on budget, with zero regrets

The difference between these two paths? ₦30,000 and 2 minutes.

Instant download · 100% money-back guarantee · Secure payment

⏰ REMINDER: Price increases to ₦50,000 on March 1st, 2025. Lock in ₦30,000 pricing today.

Questions? Email: support@lkmn.us