87% of Nigerian construction projects go over budget because builders skip critical specifications. Get the exact 247-page blueprint that shows you what to do, when to do it, and what NOT to waste money on—before you break ground.
Just ONE wrong demolition decision costs you:
• Throwing away rubble instead of recycling it for hardcore: ₦850,000 wasted
• Missing temporary wall support specifications: ₦3.2M in collapse repairs
• Disposing aluminum roofing you could've sold: ₦280,000 lost
• Skipping decontamination step: ₦450,000 in pest treatment later
That's ₦4.78 Million gone in JUST the demolition phase. And there are 25 more phases.
Here's Everything You Get:
✓ Complete 247-page specification document covering all 26 construction phases
✓ Cost-cutting checklists showing where to save money without compromising quality
✓ Material recovery strategies (reclaim ₦800k+ in salvageable materials)
✓ Contractor oversight guide (catch billing errors before you pay)
✓ Regulatory compliance certification (pass inspections first time, every time)
Total Value: ₦2.8M+ in savings on average project
📥 Instant download to your email (2 minutes max)
100% Money-Back Promise: If this doesn't save you at least ₦500,000 on your project, just show us your receipts and we'll refund every kobo. No questions asked.
This is what happens when you build without proper specifications. Every phase compounds the previous mistake until your budget is unrecognizable.
Workers tear down the old structure. No specification document. They dispose of 18 tons of rubble (₦180k disposal fees), throw away aluminum roofing (worth ₦280k), and don't install temporary supports on the boundary wall.
The damage:
• Wasted rubble that should've been recycled for hardcore: ₦850,000
• Lost aluminum roofing revenue: ₦280,000
• Boundary wall cracks (no temporary support): ₦1,850,000 repair
Phase 1 overrun: ₦2,980,000
Foundation excavation begins. Your contractor uses the wrong concrete mix ratio (no spec to reference). Doesn't compact soil properly. Uses substandard reinforcement spacing. The building inspector shows up...
🚫 WORK STOPPED: Foundation fails structural integrity test
Now you must:
• Demolish and re-excavate entire foundation: ₦2,400,000
• New structural engineer assessment + re-approval: ₦580,000
• Correct concrete mix and reinforcement: ₦1,200,000
• 6-week delay (labor idle, material price increases): ₦890,000
Phase 2 overrun: ₦5,070,000
The spec would've shown: exact concrete ratios, compaction requirements, reinforcement spacing. Cost to prevent: ₦0.
Walls go up. Your contractor uses 6-inch blocks where specs require 9-inch for load-bearing walls. Roof timber isn't treated for termites. Waterproofing membrane is wrong grade.
Three months later, you discover:
• Walls are cracking under roof load (wrong block size): ₦1,680,000 reinforcement
• Termites in roof timber (not treated per spec): ₦920,000 replacement
• Wrong waterproofing = ceiling leaks after first rain: ₦440,000
Phase 3 overrun: ₦3,040,000
Time to finish. But the wall cracks mean tiles won't stick properly. Plumbing wasn't spec'd correctly—pipes are undersized. Electrical wiring uses wrong cable gauge (fire hazard). Everything needs redoing.
The final blows:
• Re-tiling entire house (surface prep failures): ₦680,000
• Replumb with correct pipe sizes: ₦540,000
• Rewire entire electrical system (safety requirement): ₦1,150,000
Phase 4 overrun: ₦2,370,000
Original budget: ₦8,000,000
Demolition mistakes: +₦2,980,000
Foundation failure: +₦5,070,000
Structural issues: +₦3,040,000
Finish rework: +₦2,370,000
Final cost: ₦19,460,000
Budget overrun: 143% (₦11.46M over)
Every single one of these disasters is documented and prevented in the specification document. The document costs ₦30,000. The mistakes cost ₦11,460,000.
of Nigerian builds go over budget
Average overrun: ₦4.2M
months of delays on average
Due to specification errors
prevents ₦2-7M in losses
764:1 return on investment
Your contractor will NEVER tell you about these specifications. Why? Because mistakes make them more money. Rework = more billing. "Unforeseen issues" = more profit. They're incentivized to keep you in the dark.
This document is your protection. ₦30,000 to know exactly what should happen at every stage.
So when your contractor says "trust me," you can verify. Every. Single. Thing.
247 pages of exactly what to do, when to do it, and what it should cost—so you never overpay or redo work again.
Here's exactly how detailed every specification is...
Section 1.3: Demolitions
Item 1.3:1.1.1.3 - Demolitions, all structures, existing building, overall size 18500 x 12450 x 3500mm high, walls built with sandcrete blockwork...
→ NOTE: Dispose blockwork rubbles away from site ONLY after breaking into pieces for hardcore filling reuse (saves ₦850k in new hardcore purchase)
Item 1.3:2.1.2.0 - Temporary support of structures, adjoining exterior walls to be retained, braced diagonally with timber struts both ways.
→ WARNING: Skipping this step leads to wall collapse requiring ₦1.8M+ repairs and 3-week delays
This level of detail × 247 pages × 26 phases = Zero surprises, zero rework
One-time payment · Instant digital delivery
Regular price: ₦50,000 (increases March 1st)
✓ Secure payment
✓ Delivered to your email within 2 minutes
✓ Download on any device (phone, laptop, tablet)
Use this document on your next project. If it doesn't save you at least ₦500,000 in prevented mistakes, send us your project receipts and we'll refund your ₦30,000—no questions asked.
We can make this guarantee because we KNOW the average builder saves ₦2.8M using these specs. You're getting a 186x return on investment.
YES. Especially if you already have a contractor. This document lets you verify everything they tell you. When they say 'this is how we always do it,' you can check if it's actually to spec. Most budget overruns happen because contractors cut corners you don't know about.
No. This covers everything from small residential homes to large commercial buildings. Whether you're building a 2-bedroom bungalow or a 4-story apartment complex, the specifications are the same. The principles don't change based on project size.
You could spend 6 months researching and still miss critical details. Google won't tell you the Nigeria-specific regulatory requirements from COREN, NIA, and NSE. It won't show you the exact quantities and methods for each phase. And it definitely won't warn you about the ₦850k mistake in demolition rubble disposal. This is 247 pages of concentrated expertise you can't piece together from blog posts.
That's EXACTLY when you need it most. Contractors who push back on proper specifications are usually the ones cutting corners. This document protects you. If your contractor is legitimate, they'll appreciate having clear guidelines. If they resist... that's a massive red flag.
Updated January 2025 with the latest Nigerian building standards. When regulations change, you get lifetime free updates. The current version is valid through February 2025—after March 1st, older specs may result in automatic rejections.
Both. Section 1.2 specifically covers 'Alterations, Repairs and Conservations.' Whether you're building from scratch or renovating an existing structure, you'll find the exact specifications you need.
One-time payment. You own it forever. Use it on unlimited projects. Share it with your team. Download it on multiple devices. No recurring fees, no hidden costs.
The document uses standard construction terminology that any contractor will understand. You don't need to be an engineer—you just need to be able to verify that your contractor is following the specs. Think of it like a recipe: you don't need to be a chef to know if they're using the right ingredients.
Join 1,247+ Nigerian builders who stopped losing money on preventable mistakes
Chidi O.
Lekki Phase 2, Lagos
4-bedroom duplex
"I caught my contractor about to dispose ₦340,000 worth of aluminum roofing because I read the demolition section first. This document paid for itself 22 times over in week 1. My contractor now knows I'm not someone he can take advantage of."
₦340,000+
Ngozi A.
Gwarinpa, Abuja
3-bedroom bungalow
"My foundation failed inspection because the concrete mix was wrong. I had to demolish everything and start over—₦6.2M wasted. If I'd had this document before starting, I would've caught it immediately. Never building without proper specs again."
Would've saved ₦6.2M
Tunde K.
Ikeja, Lagos
Commercial plaza
"I'm a quantity surveyor and I bought this as a reference tool. The level of detail is incredible—it's now my go-to document for every project estimate. Saves me hours of research and my clients love that I can show them exactly what's standard vs. what's cutting corners."
10+ hours per project
Amara E.
Port Harcourt
Residential renovation
"My contractor quoted ₦2.8M for electrical rewiring. I checked the specs and realized he was overcharging by ₦900,000. When I showed him the document, he 'recalculated' and suddenly it was ₦1.9M. This thing exposes contractor BS instantly."
₦900,000
The difference between these two paths? ₦30,000 and 2 minutes.
Instant download · 100% money-back guarantee · Secure payment
⏰ REMINDER: Price increases to ₦50,000 on March 1st, 2025. Lock in ₦30,000 pricing today.
Questions? Email: support@lkmn.us